维护区内建筑物,提供一个安全、积极及具吸引力的学习环境.
建筑和建筑维修部由九名维修技术人员和一名主管组成,并负责维护整个地区的建筑围护结构和系统的配套工具和设备.
以下是以前的战略计划和项目审查的目标以及目前的状态:
•为区域提供防火建议. Ongoing.
•为1.9亿美元债券项目提供技术支持和施工管理. Continuing.
• Implement capital renewal projects. Ongoing.
制定和实施车辆和设备更换计划. Ongoing.
继续制定预防性维护计划. Ongoing.
提供技术人员培训以提高技术水平、生产力、效率和安全性. Ongoing.
•利用供应商,顾问和志愿者的意见来协助维护活动. Ongoing.
•为校园的规模增加适当的人员配置. Ongoing.
o Develop a qualified pool of employees for project work. Unsuccessful; continuing to established a pool.
继续评估废水处理和其他法规的变化. Ongoing.
• Provide electrician with fire alarm training. Ongoing.
Strategy 1 - Preventive Maintenance
继续和改进预防性维护计划,以优化建筑和公用事业系统的寿命, serviceability and regulatory compliance.
预防性维护比纠正性维护更具成本效益. 预防性维护extendsï延长建筑系统的使用寿命,维护或提高能源效率.
Strategy 2 - Analyze Work Order Data
收集和分析工单数据,以最大限度地提高建筑维修操作的效率.
对工单数据的分析使识别建筑物成为可能, equipment or facilities that are deficient. 这种分析还将使管理层能够更有效地利用员工的努力,并加强整体决策.
Strategy 3 - Training
提供技术人员培训以提高技术水平、生产力、效率和安全性.
Building systems are increasingly more complex, 需要对维护这些系统的技术人员进行更高水平的培训. 文件和报告允许系统地安排所需的培训.
Strategy 4 - Outside Resources
利用供应商,顾问和志愿者的意见来协助维护活动.
许多外部实体有能力并愿意以低成本或免费的方式向特区提供服务, thus maximizing the departmental budget.
Strategy 5 - Analyze Work Schedule
分析工作安排,以优化部门效率,并提供更多的覆盖面,以支持校园社区.
The campus community operates on diverse schedules. 有必要在适当的时间提供适当的技能.
Strategy 6 - Staffing Level
将建筑物维修人员增加到每平方英尺适当的水平,并增加资源和材料以支持增加的工作人员.
目前的人员配备水平不足以为现有建筑提供适当的维护,也不足以为校园选民需要的选修项目提供支持.
Strategy 7 - Vehicle and Equipment Replacement
制定和实施车辆和设备更换计划.
所有设备的使用寿命都是有限的,最终都需要更换. 积极规划这一更替将有助于更好的决策和有序的过程. 目前设备的更换价值约为10万美元,平均预期寿命为10年. This will replace maintenance vehicles, aerial lifts, confined space entry equipment, 电子诊断设备和其他维修相关的工具和设备.
Strategy 8 - Project Employee Pool
Develop a qualified pool of employees for project work.
FPM没有足够的人手支持地区选修项目的工作. 临时员工为本工作提供了良好的价值.
Strategy 9 - Evaluate Position Classifications
评估维修分类以确保符合地区的需要和要求.
The current classifications are old and in need of updating.
需要人力资源部门协助评估工作分类.
None
Original Priority | Program, Unit, Area | Resource Type | Account Number | Object Code | One Time Augment | Ongoing Augment |
Description | Supporting Rationale | Potential Alternative Funding Sources | Prioritization Criteria | |||
1 | Construction and Building Maintenance | Operating Expenses | 110002101651000 | $22,132.00 | $3,540.00 | |
Purchase Air Filters for Welding & Manufacturing Building and Kinesiology & Athletic Performance Center and Press Box | 维修供应预算没有足够的资金为新的暖通空调系统购买所需的空气过滤器 & Manufacturing Building (WM) and Kinesiology & Athletic Performance Center (KAPC) and Press Box (PB). Mechanical Filters for KAPC, PB and WM: $3,540 (ongoing) 焊接46个展位教学设备过滤器,第二期:$22,132(一次性) |
|
|
|||
2 | Construction and Building Maintenance | Equipment | 110002101651000 | $7,000.00 | $0.00 | |
Equipment Purchase for Welding & Manufacturing Building | 采购压机以支持焊接机械和管道的新技术系统 & 制造商大楼,以获得配件和封闭隔离. |
|
|
|||
3 | Construction and Building Maintenance | Personnel | 110002101651000 | 52130 | $0.00 | $83,444.00 |
聘请一名高级维修技术员(40小时,12个月) | Due to the significant increase in 53,536平方英尺和显著的使用量增加在Skyway中心柴油实验室和焊接 & Manufacturing and Kinesiology & Athletic Performance Center, 需要额外的维护人员支持,以保持对每个设施的充分护理. |
|
|
|||
4 | Construction and Building Maintenance | Operating Expenses | 110002101651000 | 55200 | $0.00 | $2,500.00 |
Training | Building systems are increasingly more complex, 需要对维护这些系统的技术人员进行更高水平的培训. |
|
|